Parallel machine scheduling with batch delivery to two customers
From MaRDI portal
Publication:1665075
DOI10.1155/2015/247356zbMATH Open1394.90319OpenAlexW1720760452WikidataQ59117718 ScholiaQ59117718MaRDI QIDQ1665075FDOQ1665075
Authors: Xueling Zhong, Dakui Jiang
Publication date: 27 August 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/247356
Recommendations
- Supply chain scheduling with parallel machines
- Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost
- Heuristics for parallel machine scheduling with batch delivery consideration
- Two parallel machines scheduling with two-vehicle job delivery to minimize makespan
- Integrated Job Scheduling with Parallel-Batch Processing and Batch Deliveries
Cites Work
- Title not available (Why is that?)
- Heuristics for parallel machine scheduling with delivery times
- Machine scheduling with job delivery coordination
- Integrated Scheduling of Production and Distribution Operations
- Scheduling. Theory, algorithms, and systems.
- Integrated machine scheduling and vehicle routing with time windows
Cited In (7)
- Mixed binary integer programming formulation for the two-echelon supply chain system with two customer locations
- A review on integrated scheduling and outbound vehicle routing problems
- Scheduling on parallel machines to minimise maximum lateness for the customer order problem
- Scheduling identical parallel machines with a fixed number of delivery dates
- Scheduling parallel machines for the customer order problem
- Two parallel machines scheduling with two-vehicle job delivery to minimize makespan
- Supply chain scheduling with parallel machines
This page was built for publication: Parallel machine scheduling with batch delivery to two customers
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1665075)