Developing optimal reservoir operation for multiple and multipurpose reservoirs using mathematical programming
Summary: Over the last decades, the increasing water demand has caused a number of problems, to which reservoir operation optimization has been suggested as one of the best solutions. In this research, a model based on mixed integer linear programming (MILP) technique is developed for the systematic operation of multireservoirs that are used to cater for the different needs of the Tehran-Karaj plain. These reservoirs include Laar, Latian, and Karaj dams. The system configuration was accomplished through the nodes and arcs of the network flow model approach and system component implementation including sources, consumption, junctions, and the physical and hydraulic relationship between them. The following were performed via comprehensive developed software: system configuration, objective function and constraints formulation, linearization, determining penalty values, and setting priorities for each node and arc in the system. A comparison between the MILP developed model's results against the periodic data shows 21.7\% less overflow, 11.6\% more outflow, and 15.9\% more reservoir storage, respectively. The outcome of the MILP-based modeling indicates superior performance to the historical period.
- Multiple reservoir system operational planning using multi-criterion decision analysis
- Application of goal programming in a multi-objective reservoir operation model in Tunisia
- scientific article; zbMATH DE number 1190631
- Multi-reservoir production optimization
- Reservoir operations optimization via fuzzy criterion decision processes
- Optimal long-term operation of a multi-reservoir power system for critical water conditions
- Stochastic optimization models for risk-based reservoir management
- A mixed 0-1 linear programming approach to the computation of all pure-strategy Nash equilibria of a finite \(n\)-person game in normal form
- Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market
- Short-term hydropower production planning by stochastic programming
This page was built for publication: Developing optimal reservoir operation for multiple and multipurpose reservoirs using mathematical programming
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1665671)