Transient analysis of a k-out-of-n : G system with N-policy, repairmen's multiple vacations, and redundant dependency
From MaRDI portal
Publication:1723232
DOI10.1155/2015/209653zbMATH Open1418.90098OpenAlexW1574433923WikidataQ59105684 ScholiaQ59105684MaRDI QIDQ1723232FDOQ1723232
Authors: Wenqing Wu, Yinghui Tang
Publication date: 19 February 2019
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2015/209653
Recommendations
- Reliability analysis for a \(k\)-out-of-\(n\):G system with redundant dependency and repairmen having multiple vacations
- Analysis of a repairable \(k\)-out-of-\(n\):\(G\) system with repairman's multiple delayed vacations
- Reliability analysis of a \(k\)-out-of-\( n: G\) repairable system with single vacation
- Analysis of a \(k/n (g)\) system with expert repairman's multiple vacations and replaceable repair facility
- Computation and profit analysis of a \(k\)-out-of-\(n\):\(G\) repairable system under \(N\)-policy with multiple vacation and one replaceable repair facility
Cites Work
- Title not available (Why is that?)
- Reliability analysis for a \(k\)-out-of-\(n\):G system with redundant dependency and repairmen having multiple vacations
- Calculating the Rate of Occurrence of Failures for Continuous-time Markov Chains with Application to a Two-component Parallel System
- \(k\)-out-of-\(n\): \(G\) system with repair: The \(D\)-policy
- A phase-type geometric process repair model with spare device procurement and repairman's multiple vacations
- Stability analysis of a new kind \(n\)-unit series repairable system
- Reliability analysis for a \(k/n(F)\) system with repairable repair-equipment
- Multi-server machine repair problems under a \((V,R)\) synchronous single vacation policy
- New model for load-sharing k-out-of-n: G system with different components
- Availability optimization of a redundant system through dependency modeling
- Reliability analysis of a \(k\)-out-of-\( n: G\) repairable system with single vacation
- Load sharing \(M\)-out of-\(N\): \(G\) system with non-identical components subject to common cause failure
Cited In (7)
- Availability equivalence analysis of a repairable multistate parallel-series system with different performance rates
- A \(k\)-out-of-\(n\) reliability system with an unreliable server and phase type repairs and services: The \((N,T)\) policy
- Title not available (Why is that?)
- Computation and profit analysis of a \(k\)-out-of-\(n\):\(G\) repairable system under \(N\)-policy with multiple vacation and one replaceable repair facility
- Reliability and optimization for \(k\)-out-of-\(n\): \(G\) mixed standby retrial system with dependency and \(J\)-vacation
- N-policy for redundant repairable system with multiple types of warm standbys with switching failure and vacation
- Reliability analysis for a \(k\)-out-of-\(n\):G system with redundant dependency and repairmen having multiple vacations
This page was built for publication: Transient analysis of a \(k\)-out-of-\(n \text{:} G\) system with \(N\)-policy, repairmen's multiple vacations, and redundant dependency
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1723232)