Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families
From MaRDI portal
Publication:1734827
Recommendations
- Scheduling batch processing machines with incompatible job families
- Minimizing number of tardy jobs on a batch processing machine with incompatible job families
- Batch scheduling to minimize maximum lateness
- Single machine scheduling with batch set-up times to minimize maximum lateness
- Optimal methods for batch processing problem with makespan and maximum lateness objectives
Cites work
- A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
- Batch scheduling to minimize maximum lateness
- Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
- Exact and heuristic algorithms for the just-in-time scheduling problem in a batch processing system
- Heuristic scheduling of jobs on a multi-product batch processing machine
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling
- Scheduling a single batch processing machine with non-identical job sizes
- Scheduling batch processing machines with incompatible job families
- Scheduling jobs on a single batch processing machine with incompatible job families and weighted number of tardy jobs objective
- Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families
- The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan
Cited in
(9)- Batch scheduling to minimize maximum lateness
- A survey of scheduling with parallel batch (p-batch) processing
- Minimizing maximum tardiness on a single machine with family setup times and machine disruption
- Scheduling jobs on a single batch processing machine with incompatible job families and weighted number of tardy jobs objective
- Customer order scheduling on a serial-batch machine in precast bridge construction
- Novel mathematical formulations for parallel-batching processing machine scheduling problems
- Minimizing number of tardy jobs on a batch processing machine with incompatible job families
- A mixed integer programming model and dynamic programming-based approach for multi-product production scheduling under deterioration effect
- Optimal methods for batch processing problem with makespan and maximum lateness objectives
This page was built for publication: Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1734827)