Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm
DOI10.1007/s10700-014-9200-6zbMath1428.90061OpenAlexW2094998921MaRDI QIDQ1794539
Publication date: 15 October 2018
Published in: Fuzzy Optimization and Decision Making (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10700-014-9200-6
extended priority-based discrete particle swarm optimization (EP-DPSO)extended priority-based hybrid genetic algorithm (EP-HGA)multistage and multi-time-period (MSMT) supply chaintriangular fuzzy demand
Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (4)
Uses Software
Cites Work
- Multi-objective genetic algorithm for single machine scheduling problem under fuzziness
- A possibilistic approach to the modeling and resolution of uncertain closed-loop logistics
- A class of multi-objective supply chain networks optimal model under random fuzzy environment and its application to the industry of Chinese liquor
- Network Models and Optimization
- Unnamed Item
This page was built for publication: Multistage production distribution under uncertain demands with integrated discrete particle swarm optimization and extended priority-based hybrid genetic algorithm