Algorithms for minimizing maximum lateness with unit length tasks and resource constraints
DOI10.1016/0166-218X(93)90042-MzbMATH Open0792.68012DBLPjournals/dam/BlazewiczKM93WikidataQ57387894 ScholiaQ57387894MaRDI QIDQ1803669FDOQ1803669
Authors: Jacek Blazewicz, Wieslaw Kubiak, Silvano Martello
Publication date: 29 June 1993
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Recommendations
- Single and two-resource allocation algorithms for minimizing the maximal lateness in a single machine
- An Algorithm for Minimizing the Range of Lateness on a Single Machine
- Approximation schemes for minimizing the maximum lateness on a single machine with release times under non-availability or deadline constraints
- Approximation algorithms for scheduling a single machine to minimize total late work
- An iterative algorithm for scheduling unit-times tasks with precedence constraints to minimise the maximum lateness
- Approximation algorithms for minimizing the maximum lateness and makespan on parallel machines
- Approximation algorithms for minimizing the total weighted tardiness on a single machine
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
- Solution algorithms for minimizing the total tardiness with budgeted processing time uncertainty
- Approximation Algorithms for Scheduling Problems with Exact Delays
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cites Work
- Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H]
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A linear time algorithm for restricted bin packing and scheduling problems
- Complexity Results for Multiprocessor Scheduling under Resource Constraints
- Scheduling subject to resource constraints: Classification and complexity
- Concurrent Task Systems
- Title not available (Why is that?)
- Some new results in flow shop scheduling
- Title not available (Why is that?)
- Scheduling tasks on two processors with deadlines and additional resources
- Preemptive Scheduling, Linear Programming and Network Flows
- Minimizing mean flow time with parallel processors and resource constraints
- Bounds on list scheduling of UET tasks with restricted resource constraints
- Coffman-Graham scheduling of UET task systems with 0-1 resources
- Simple algorithms for multiprocessor scheduling to meet deadlines
Cited In (6)
- Production, maintenance and resource scheduling: a review
- Polynomial time algorithms for some minimum latency problems
- LP rounding and combinatorial algorithms for minimizing active and busy time
- An iterative algorithm for scheduling unit-times tasks with precedence constraints to minimise the maximum lateness
- Parallel machine scheduling with additional resources: notation, classification, models and solution methods
- Algorithms and Data Structures
This page was built for publication: Algorithms for minimizing maximum lateness with unit length tasks and resource constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1803669)