Some new results in flow shop scheduling
From MaRDI portal
Publication:3312010
DOI10.1007/BF01919082zbMATH Open0529.90059OpenAlexW1982276972MaRDI QIDQ3312010FDOQ3312010
Authors: H. Rock
Publication date: 1984
Published in: Zeitschrift für Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf01919082
NP-hardnesssingle resource constraint2-machine flow shopsminimal maximum latenessminimal mean flow timeno wait in process
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Optimal two- and three-stage production schedules with set-up time included
- The Complexity of Flowshop and Jobshop Scheduling
- Scheduling subject to resource constraints: Classification and complexity
- Unit Execution Time Shop Problems
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Flowshop and Jobshop Schedules: Complexity and Approximation
- On the Flow-Shop Sequencing Problem with No Wait in Process†
- Flowshop scheduling with limited temporary storage
- Title not available (Why is that?)
- Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops
Cited In (37)
- Job shop scheduling with unit time operations under resource constraints and release dates
- The non-stop disjoint trajectories problem
- SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
- Flow shops with WIP and value added costs
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem
- Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion
- Flow shop scheduling problem with conflict graphs
- Path cover with minimum nontrivial paths and its application in two-machine flow-shop scheduling with a conflict graph
- A review of TSP based approaches for flowshop scheduling
- Scheduling tasks on two processors with deadlines and additional resources
- Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs
- The complexity of scheduling jobs in repetitive manufacturing systems
- No-wait flowshops with bicriteria of makespan and maximum lateness.
- On the exact solution of the no-wait flow shop problem with due date constraints
- Open shop scheduling with synchronization
- Flexible flow shop with dedicated buffers
- Decomposition algorithms for synchronous flow shop problems with additional resources and setup times
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- Study on resource-dependent no-wait flow shop scheduling with different due-window assignment and learning effects
- Optimizing blocking flow shop scheduling problem with total completion time criterion
- Coupled task scheduling with exact delays: literature review and models
- Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- Minimizing total completion time in two-machine flow shops with exact delays
- Algorithms for minimizing maximum lateness with unit length tasks and resource constraints
- On a scheduling problem in a robotized analytical system
- Complexity results for flow shop problems with synchronous movement
- Some no-wait shops scheduling problems: Complexity aspect
- Two machine flow shop scheduling problem with weighted WIP costs
- Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking
- Scheduling unit-time tasks in renewable resource constrained flowshops
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
- A two-machine no-wait flow shop problem with two competing agents
- Nonpreemptive flowshop scheduling with machine dominance
- No-wait or no-idle permutation flowshop scheduling with dominating machines
- Minimizing mean flow time with parallel processors and resource constraints
This page was built for publication: Some new results in flow shop scheduling