Flow shops with WIP and value added costs
From MaRDI portal
Recommendations
Cites work
- A new heuristic for the n-job, M-machine flow-shop problem
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Flowshop sequencing with mean flowtime objective
- scientific article; zbMATH DE number 4209899 (Why is no real title available?)
- scientific article; zbMATH DE number 1187164 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation
- Minimizing the total flow time and the tardiness in a two-machine flow shop
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases
- Openshop and flowshop scheduling to minimize sum of completion times
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Polynomial time approximation algorithms for machine scheduling: Ten open problems
- Some new results in flow shop scheduling
- The Complexity of Flowshop and Jobshop Scheduling
- The complexity of scheduling jobs in repetitive manufacturing systems
- The two-machine total completion time flow shop problem
This page was built for publication: Flow shops with WIP and value added costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q969753)