scientific article; zbMATH DE number 4158358
From MaRDI portal
Publication:3486356
Recommendations
- scientific article; zbMATH DE number 4089300
- Efficient algorithms for minimum-cost flow problems with piecewise-linear convex costs
- scientific article; zbMATH DE number 1131737
- scientific article; zbMATH DE number 1911010
- The flow shop problem with time lags and separated setup times
- scientific article; zbMATH DE number 4147845
- Flow constrained minimum cost flow problem
- A flexible flowshop problem with total flow time minimization
- Two-machine flow shop scheduling problem under linear constraints
- An optimal production flow control problem with piecewise constant demand
Cited in
(6)- A two-machine flow shop scheduling problem with controllable job processing times
- scientific article; zbMATH DE number 4143766 (Why is no real title available?)
- scientific article; zbMATH DE number 4085399 (Why is no real title available?)
- scientific article; zbMATH DE number 4085400 (Why is no real title available?)
- Two machine flow shop scheduling problem with weighted WIP costs
- Flow shops with WIP and value added costs
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3486356)