Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
Special pages
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

Strategic options in re-engineering of a manufacturing system with uncertain completion time

From MaRDI portal
Jump to:navigation, search

DOI10.1016/S0377-2217(98)00168-4zbMATH Open0946.90020OpenAlexW2020803982MaRDI QIDQ1809869FDOQ1809869


Authors: John J. Liu, Dong-Qing Yao Edit this on Wikidata


Publication date: 25 November 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00168-4




Recommendations

  • Modeling in the problems of production system reengineering
  • Using real options analysis to value reoptimization options in the shifting bottleneck heuristic
  • Optimal control of a simple manufacturing system with restarting costs
  • Optimal timing of partial outsourcing decisions
  • Sequencing a Set of Alternatives Under Time Constraints


zbMATH Keywords

optionsstochastic controlfree-boundary problemsre-engineering


Mathematics Subject Classification ID

Production models (90B30)


Cites Work

  • Funding Criteria for Research, Development, and Exploration Projects
  • Information Assets, Technology and Organization
  • Title not available (Why is that?)






This page was built for publication: Strategic options in re-engineering of a manufacturing system with uncertain completion time

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1809869)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1809869&oldid=14169380"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 1 February 2024, at 09:22. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki