Coordinating multi-location production and customer delivery
From MaRDI portal
Publication:1936790
DOI10.1007/s11590-011-0392-1zbMath1261.90018OpenAlexW1977279265MaRDI QIDQ1936790
Publication date: 7 February 2013
Published in: Optimization Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s11590-011-0392-1
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Single-machine batch scheduling minimizing weighted flow times and delivery costs
- Online scheduling of weighted equal-length jobs with hard deadlines on parallel machines
- Financial engineering, E-commerce and supply chain
- The coordination of scheduling and batch deliveries
- On the machine scheduling problem with job delivery coordination
- Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs
- A note on the complexity of single-machine scheduling with a common due date, earliness-tardiness, and batch delivery costs
- Single machine scheduling with batch deliveries
- On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date
- Heuristics for parallel machine scheduling with delivery times
- Design and operational issues in AGV-served manufacturing systems
- Scheduling deliveries in vehicles with multiple compartments
- Machine scheduling with job delivery coordination
- Supply chain optimization.
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Scheduling Parts in a Combined Production-transportation Work Cell
- Complex Scheduling
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Machine scheduling with transportation considerations
- Makespan minimization for flow-shop problems with transportation times and a single robot
This page was built for publication: Coordinating multi-location production and customer delivery