Scheduling Parts in a Combined Production-transportation Work Cell
flexible manufacturing systemtwo-machine flowshopasymmetric travelling salesmantwo machines in seriesproduction-transportation scheduling problemrobotic transfer devicetwo-machine, automated manufacturing cell
Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08) Abstract computational complexity for mathematical programming problems (90C60) Transportation, logistics and supply chain management (90B06) Production models (90B30)
- Flowshop Scheduling of Robotic Cells with Job-dependent Transportation and Set-up Effects
- Scheduling of parts and robot activities in a two machine robotic cell
- Flowshop scheduling with interstage job transportation
- Scheduling in Robotic Cells: Classification, Two and Three Machine Cells
- Scheduling in Robotic Cells: Heuristics and Cell Design
- Quasi-linear production systems: Optimization of the transportation system
- Optimization of processing and delivery decisions involving third-party machines
- Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times
- On-line scheduling in a surface treatment system
- Makespan minimization for flow-shop problems with transportation times and a single robot
- A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
- Algorithms for sequencing robot activities in a robot-centered parallel- processor workcell
- Scheduling a two-machine robotic cell: A solvable case
- Machine scheduling with transportation considerations
- Machine scheduling with job delivery coordination
- Scheduling in manufacturing with transportation: classification and solution techniques
- A branch-and-bound algorithm with fuzzy inference for a permutation flowshop scheduling problem
- Auction-based cooperation mechanism for cell part scheduling with transportation capacity constraint
- Flowshop scheduling with interstage job transportation
- scientific article; zbMATH DE number 777706 (Why is no real title available?)
- Hybrid flowshop scheduling with interstage job transportation
- Coordinating multi-location production and customer delivery
- The evolution of schematic representations of flow shop scheduling problems
- Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes
- Machine scheduling with deliveries to multiple customer locations
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times
- Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
- A scatter search approach with dispatching rules for a joint decision of cell formation and parts scheduling in batches
This page was built for publication: Scheduling Parts in a Combined Production-transportation Work Cell
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3483069)