Flowshop scheduling with interstage job transportation
From MaRDI portal
(Redirected from Publication:892841)
Recommendations
- Hybrid flowshop scheduling with interstage job transportation
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- Complexity of flow shop scheduling problems with transportation constraints
- A two-stage flow shop scheduling problem with transportation considerations
- Machine scheduling with transportation considerations
Cites work
- scientific article; zbMATH DE number 3689114 (Why is no real title available?)
- scientific article; zbMATH DE number 226824 (Why is no real title available?)
- Algorithms and Computation
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One Stage
- Bounds for Certain Multiprocessing Anomalies
- Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
- Integrated Production and Outbound Distribution Scheduling: Review and Extensions
- Machine scheduling with transportation considerations
- Makespan minimization for flow-shop problems with transportation times and a single robot
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Optimal two- and three-stage production schedules with set-up time included
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Scheduling Parts in a Combined Production-transportation Work Cell
- Scheduling a hybrid flowshop with batch production at the last stage
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Scheduling of a Two-machine Flowshop with Travel Time Between Machines
- The Tight Bound of First Fit Decreasing Bin-Packing Algorithm Is FFD(I) ≤ 11/9OPT(I) + 6/9
- The hybrid flow shop scheduling problem
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
Cited in
(21)- An improved two-machine flowshop scheduling with intermediate transportation
- A note on the complexity of flow shop scheduling with transportation constraints
- Two-machine flowshop scheduling with intermediate transportation under job physical space consideration
- Machine scheduling with transportation considerations
- Transportation and delivery in flow-shop scheduling problems: a systematic review
- A two-stage flow shop scheduling problem with transportation considerations
- Scheduling in manufacturing with transportation: classification and solution techniques
- scientific article; zbMATH DE number 6747350 (Why is no real title available?)
- Cooperative game theory based coordinated scheduling of two-machine flow-shop and transportation
- Complexity of flow shop scheduling problems with transportation constraints
- Scheduling Parts in a Combined Production-transportation Work Cell
- Flow shop scheduling problems with transportation constraints revisited
- Flow shop scheduling problems with transportation constraints revisited
- Optimal algorithms for flow shop schedule with transporter
- Mathematical modelling and heuristic approaches to job-shop scheduling problem with conveyor-based continuous flow transporters
- scientific article; zbMATH DE number 7028188 (Why is no real title available?)
- Hybrid flowshop scheduling with interstage job transportation
- Decomposition heuristics for the hybrid flexible flowshop with transportation times
- AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER
- Analysis of the job shop system with transport and setup times in deadlock-free operating conditions
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
This page was built for publication: Flowshop scheduling with interstage job transportation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q892841)