scientific article; zbMATH DE number 7028188
From MaRDI portal
Publication:4623871
Recommendations
- Hybrid flowshop scheduling with interstage job transportation
- Reentrant hybrid flowshop scheduling problem based on total weighted completion time
- New multi-objective method to solve reentrant hybrid flow shop scheduling problem
- Flowshop scheduling with interstage job transportation
- Flow shop scheduling problems with transportation constraints revisited
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- A two-stage flow shop scheduling problem with transportation considerations
- A hybrid two-stage transportation and batch scheduling problem
- Two-stage hybrid flow shop scheduling with dynamic job arrivals
Cited in
(7)- New multi-objective method to solve reentrant hybrid flow shop scheduling problem
- Lagrangian relaxation algorithm for scheduling problems of reentrant hybrid flow shops
- scientific article; zbMATH DE number 6001874 (Why is no real title available?)
- Efficient methods to schedule re-entrant flowshop system
- Reentrant hybrid flowshop scheduling problem based on total weighted completion time
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4623871)