Quantitative stability analysis for vector problems of 0-1 programming

From MaRDI portal
Publication:1952505

DOI10.1016/j.disopt.2010.02.001zbMath1293.90070OpenAlexW2038162660WikidataQ57594128 ScholiaQ57594128MaRDI QIDQ1952505

Dmitry Podkopaev, Vladimir A. Emelichev

Publication date: 31 May 2013

Published in: Discrete Optimization (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.disopt.2010.02.001



Related Items

On one type of stability for multiobjective integer linear programming problem with parameterized optimality, Postoptimal analysis of the multicriteria combinatorial median location problem, Unnamed Item, On the stability measure of solutions to a vector version of an investment problem, A general approach to the calculation of stability radii for the max-cut problem with multiple criteria, Stability analysis of efficient portfolios in a discrete variant of multicriteria investment problem with Savage's risk criteria, Unnamed Item, Unnamed Item, On the quasistability radius for a multicriteria integer linear programming problem of finding extremum solutions, Multicriterial investment problem in conditions of uncertainty and risk, Unnamed Item, On the calculation of stability radius for multi-objective combinatorial optimization problems by inverse optimization, Multicriteria investment problem with Savage's risk criteria: theoretical aspects of stability and case study, The multilevel facility location and pricing problems: the computational complexity and the stability analysis, Balancing of simple assembly lines under variations of task processing times, Quantitative stability analysis for vector problems of 0-1 programming, Stability radius of a vector investment problem with Savage's minimax risk criteria, Uncertainty measure for the Bellman-Johnson problem with interval processing times, Unnamed Item, Stability Analysis for Pricing, Stability Aspects of Multicriteria Integer Linear Programming Problems, Estimating the Stability Radius of an Optimal Solution to the Simple Assembly Line Balancing Problem, Investment Boolean problem with savage risk criteria under uncertainty, Unnamed Item



Cites Work