Analysis of a production system with a feedback buffer and a general dispatching time.
We analyze a production system with a finite feedback buffer and dispatching time. Parts enter a ``main buffer before they are processed. Processed parts leave the system with probability \(1-p\) or are fed back to a ``feedback buffer with probability \(p\). As soon as the feedback buffer becomes full, the parts in the feedback buffer are dispatched, all at once, to the main buffer by the server for reprocessing. The dispatching time follows a general distribution. Thus the server is engaged either in one of the following states: idle, processing, dispatching. We derive various performance measures such as the mean number of parts in each buffer, the mean system sojourn time and the dispatching rate. We also discuss the effects of the dispatching time on the performance measures. We finally derive the procedure to obtain the optimal buffer size that minimizes the overall operating cost.
- scientific article; zbMATH DE number 1873273
- scientific article; zbMATH DE number 627497
- Analysis and design of a production-inventory system using discrete-time queueing models
- Design of a production system with a feedback buffer
- Publication:4861869
- System-theoretic analysis of due-time performance in production systems
- Buffer allocation in flow-shop-type production systems with general arrival and service patterns
- Analysis of multistation production systems with limited buffer capacity. II: The decomposition method
This page was built for publication: Analysis of a production system with a feedback buffer and a general dispatching time.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1975979)