Minimizing delays in a shunting yard
DOI10.1007/S00291-015-0391-1zbMATH Open1311.90011OpenAlexW1984026584MaRDI QIDQ2018111FDOQ2018111
Andreas Wiehl, Johannes Rieder, Florian Jaehn
Publication date: 10 April 2015
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-015-0391-1
Recommendations
- Adapting exact and heuristic procedures in solving an NP-hard sequencing problem
- An integrated dispatching model for rail yards operations.
- The basic train makeup problem in shunting yards
- Minimizing the maximal weighted lateness of delivering orders between two railroad stations
- Shunting operations at flat yards: retrieving freight railcars from storage tracks
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06)
Cites Work
- Title not available (Why is that?)
- Minimizing Total Tardiness on One Machine is NP-Hard
- One-Machine Sequencing to Minimize Certain Functions of Job Tardiness
- New Precedence Theorems for One-Machine Weighted Tardiness
- The train marshalling problem
- Multistage methods for freight train classification
- Track allocation in freight-train classification with mixed tracks
- Optimal freight train classification using column generation
Cited In (3)
Uses Software
This page was built for publication: Minimizing delays in a shunting yard
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2018111)