The two-echelon production-routing problem
From MaRDI portal
Publication:2028880
Recommendations
- The two-echelon inventory-routing problem with fleet management
- The two-echelon multi-depot inventory-routing problem
- Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems
- An exact algorithm for the two-echelon capacitated vehicle routing problem
- The production routing problem: a review of formulations and solution algorithms
Cites work
- A Branch-and-Cut Algorithm for the Resolution of Large-Scale Symmetric Traveling Salesman Problems
- A memetic algorithm with dynamic population management for an integrated production-distribution problem
- A multi-phase heuristic for the production routing problem
- A new branch-and-cut algorithm for the capacitated vehicle routing problem
- A reactive GRASP and path relinking for a combined production-distribution problem
- A unified decomposition matheuristic for assembly, production, and inventory routing
- A variable MIP neighborhood descent algorithm for managing inventory and distribution of cash in automated Teller machines
- Alternative formulations and improved bounds for the multi-depot fleet size and mix vehicle routing problem
- An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing
- Analysis of an improved branch-and-cut formulation for the inventory-routing problem with transshipment
- Analysis of the maximum level policy in a production-distribution system
- Coordination of production and distribution planning
- Exact solution methods for the multi-period vehicle routing problem with due dates
- Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems
- Industrial aspects and literature survey: Combined inventory management and routing
- Local branching
- Sequential versus integrated optimization: production, location, inventory control, and distribution
- Tabu search with path relinking for an integrated production-distribution problem
- The exact solution of several classes of inventory-routing problems
- The integrated production-inventory-distribution-routing problem
- The production routing problem: a review of formulations and solution algorithms
- The two-echelon multi-depot inventory-routing problem
Cited in
(20)- The two-echelon multi-depot inventory-routing problem
- MIP formulations and heuristics for two-level production-transportation problems
- Two-echelon location routing synchronized with production schedules and time windows
- An infeasible space exploring matheuristic for the production routing problem
- Two-echelon vehicle routing problems: a literature review
- Stochastic production routing problem for perishable products: modeling and a solution algorithm
- The two-echelon inventory-routing problem with fleet management
- Rolling horizon-based heuristics for solving a production-routing problem with price-dependent demand
- The production routing problem: a review of formulations and solution algorithms
- A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows
- Split demand and deliveries in an integrated three-level lot sizing and replenishment problem
- Pre-auction lane selection in an integrated production–distribution planning problem
- The effect of different mathematical formulations on a matheuristic algorithm for the production routing problem
- Collection-disassembly-delivery problem of disassembly centers in a reverse logistics network
- A matheuristic for the two-echelon inventory-routing problem
- A progressive hedging-based matheuristic for the stochastic production routing problem with adaptive routing
- Integrated mobile facility production and distribution scheduling planning; a synchronized solution framework
- A sample average approximation-based heuristic for the stochastic production routing problem
- Production routing decisions in a two-echelon supply chain with multiple delivery modes
- Branch-price-and-cut for the production routing problem with time windows
This page was built for publication: The two-echelon production-routing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2028880)