Long-term resource planning in the high-tech industry: capacity or inventory?
From MaRDI portal
Publication:2030334
DOI10.1016/j.ejor.2020.12.062zbMath1487.90258OpenAlexW2929179616MaRDI QIDQ2030334
Ton G. de Kok, Zümbül Atan, Dina Smirnov, Willem van Jaarsveld
Publication date: 7 June 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2020.12.062
stochastic programmingscenario-based approachcapacity expansiondeterministic equivalenthigh-tech industrymulti-echelon assembly system
Cites Work
- Unnamed Item
- Stochastic multi-site capacity planning of TFT-LCD manufacturing using expected shadow-price based decomposition
- A stochastic programming model for strategic capacity planning in thin film transistor-liquid crystal display (TFT-LCD) industry
- Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity
- Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
- An enhanced L-shaped method for optimizing periodic-review inventory control problems modeled via two-stage stochastic programming
- A multiobjective metaheuristic for a mean-risk multistage capacity investment problem with process flexibility
- Tool capacity planning in semiconductor manufacturing.
- Sensitive terms in the path integral: Ordering and stochastic options
- A review on strategic capacity planning for the semiconductor manufacturing industry
- The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty
- Managing Capacity and Inventory Jointly in Manufacturing Systems
- Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand
- The Stability of a Capacitated, Multi-Echelon Production-Inventory System Under a Base-Stock Policy
- Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems
- Robust capacity planning in semiconductor manufacturing
This page was built for publication: Long-term resource planning in the high-tech industry: capacity or inventory?