The crop growth planning problem in vertical farming
From MaRDI portal
Publication:2031116
DOI10.1016/j.ejor.2021.01.034zbMath1487.90319OpenAlexW3128600365WikidataQ110578098 ScholiaQ110578098MaRDI QIDQ2031116
Publication date: 8 June 2021
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2021.01.034
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Non-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithms
- Parallel machine scheduling with splitting jobs
- Scheduling with job release dates, delivery times and preemption penalties
- Single-item dynamic lot-sizing problems: an updated survey
- Scheduling with batching: A review
- The hybrid flow shop scheduling problem
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- A research survey: review of flexible job shop scheduling techniques
- Job-shop scheduling using neural networks
- A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
- Modeling industrial lot sizing problems: a review
This page was built for publication: The crop growth planning problem in vertical farming