A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
From MaRDI portal
Publication:4367014
DOI10.1057/PALGRAVE.JORS.2600373zbMATH Open0890.90086OpenAlexW1983595842MaRDI QIDQ4367014FDOQ4367014
Authors: Rasaratnam Logendran, A. Sonthinen
Publication date: 6 July 1998
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600373
Recommendations
Cited In (12)
- Scheduling flexible manufacturing cells using tabu search
- Multiple machine JIT scheduling: a tabu search approach
- A priority list based heuristic for the job shop problem: part 2 tabu search
- A real-time methodology for minimizing mean flowtime in FMSs with routing flexibility: threshold-based alternate routing
- The crop growth planning problem in vertical farming
- Production Control of a Flexible Manufacturing System in a Job Shop Environment
- Group-scheduling problems in electronics manufacturing
- Tabu search for the job-shop scheduling problem with multi-purpose machines
- Coordinated optimization of production scheduling and maintenance activities with machine reliability deterioration
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- A mathematical programming-based scheduling framework for multitasking environments
- An enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes
This page was built for publication: A Tabu search-based approach for scheduling job-shop type flexible manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4367014)