Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with \textit{strokes}
From MaRDI portal
Publication:2052979
DOI10.1007/S10100-020-00687-5OpenAlexW3033090024MaRDI QIDQ2052979FDOQ2052979
Authors: G. Rius-Sorolla, J. Maheut, S. Estellés-Miguel, Jose P. Garcia-Sabater
Publication date: 29 November 2021
Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10100-020-00687-5
Cites Work
- Information Distortion in a Supply Chain: The Bullwhip Effect
- Simultaneous lotsizing and scheduling on parallel machines
- Fenced in? Stochastic and deterministic planning models in a time-fenced, rolling-horizon scheduling system
- Solving lot-sizing problems on parallel identical machines using symmetry-breaking constraints
- Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Questioning the relative virtues of dynamic lot sizing rules
- A theory of rolling horizon decision making
- A multiperiod stochastic production planning and sourcing problem with service level constraints
- Ending inventory valuation in multiperiod production scheduling
- Stochastic Horizons for the Aggregate Planning Problem
- Improved rolling schedules for the dynamic single-level lot-sizing problem
- Minimal Forecast Horizons and a New Planning Procedure for the General Dynamic Lot Sizing Model: Nervousness Revisited
- Efficient heuristics for dynamic lot sizing
- Demand shuffle?A method for multilevel proportional lot sizing and scheduling
- Issues and opportunities regarding replanning and rescheduling frequencies
- Revising the master production schedule in a HPP framework context
Cited In (1)
This page was built for publication: Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with \textit{strokes}
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2052979)