On a parabolic partial differential equation and system modeling a production planning problem
DOI10.3934/era.2022070zbMath1486.35105OpenAlexW4226067985MaRDI QIDQ2127566
Publication date: 20 April 2022
Published in: Electronic Research Archive (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3934/era.2022070
Asymptotic behavior of solutions to PDEs (35B40) Initial value problems for second-order parabolic equations (35K15) Initial value problems for second-order parabolic systems (35K45) Solutions to PDEs in closed form (35C05) PDEs in connection with game theory, economics, social and behavioral sciences (35Q91) Semilinear parabolic equations (35K58)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- On the large time behavior of solutions of the Dirichlet problem for subquadratic viscous Hamilton-Jacobi equations
- Existence and uniqueness of positive solutions of a system of nonlinear algebraic equations
- Quasilinear parabolic systems under nonlinear boundary conditions
- Optimal portfolio and consumption rule with a CIR model under HARA utility
- Existence of solution for a class of heat equation with double criticality
- Stochastic production planning with regime switching
- Uncertain dynamical system-based decision making with application to production-inventory problems
- Topics in stability and bifurcation theory
- Optimal Control of Switching Diffusions with Application to Flexible Manufacturing Systems
- A stochastic control problem with regime switching
- Large time behavior of solutions of viscous Hamilton–Jacobi equations with superquadratic Hamiltonian
- A Stochastic production planning problem
- Optimal Production Management When Demand Depends on the Business Cycle
- Stochastic Production Planning with Production Constraints
- DYNAMIC PORTFOLIO OPTIMIZATION WITH A DEFAULTABLE SECURITY AND REGIME‐SWITCHING
- OPTION PRICING USING A REGIME SWITCHING STOCHASTIC DISCOUNT FACTOR
This page was built for publication: On a parabolic partial differential equation and system modeling a production planning problem