Multi-step crossover genetic algorithm for bi-criteria parallel machine scheduling problems
From MaRDI portal
Publication:2247676
DOI10.1504/IJMOR.2021.112275zbMath1482.90094OpenAlexW4233841062MaRDI QIDQ2247676
Mehak Chadha, Sameer Sharma, Harpreet Kaur
Publication date: 17 November 2021
Published in: International Journal of Mathematics in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1504/ijmor.2021.112275
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
This page was built for publication: Multi-step crossover genetic algorithm for bi-criteria parallel machine scheduling problems