A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system
From MaRDI portal
Publication:2256156
Recommendations
- On a medium term product recovery and disposal strategy for durable assembly products
- Modelling and evaluating product end-of-life options
- Product recovery in stochastic remanufacturing systems with multiple reuse options
- A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study
- Yield information and supplier responsiveness in remanufacturing operations.
Cites work
- A balancing method and genetic algorithm for disassembly line balancing
- A path-relinking approach for a bi-criteria disassembly sequencing problem
- An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty
- Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling
- Heuristics for demand-driven disassembly planning
- Heuristics for solving disassemble-to-order problems with stochastic yields
- Modeling reverse logistic tasks within closed-loop supply chains: an example from the automotive industry
- Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships
- Quantitative models for reverse logistics: A review
- Solving the disassembly-to-order problem using linear physical programming
- The impact of two-product joint lifecycles on capacity planning of remanufacturing networks
- The value of information in a capacitated closed loop supply chain
- Yield information and supplier responsiveness in remanufacturing operations.
Cited in
(4)- Capacitated disassembly scheduling under stochastic yield and demand
- Master disassembly scheduling in a remanufacturing system with stochastic routings
- Designing sustainable recovery network of end-of-life product during the COVID-19 pandemic: a real and applied case study
- An asynchronous parallel disassembly planning based on genetic algorithm
This page was built for publication: A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2256156)