Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling
From MaRDI portal
Publication:3377159
DOI10.1201/9780203487174zbMath1109.90001OpenAlexW405099765MaRDI QIDQ3377159
Surendra M. Gupta, Alfred J. D. Lambert
Publication date: 21 March 2006
Full work available at URL: https://doi.org/10.1201/9780203487174
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02)
Related Items (10)
Disassembly-oriented assessment methodology for product modularity ⋮ Capacitated disassembly scheduling with random demand ⋮ A classification of assembly line balancing problems ⋮ Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times ⋮ A balancing method and genetic algorithm for disassembly line balancing ⋮ Integrating disassembly line balancing in the planning of a reverse logistics network from the perspective of a third party provider ⋮ Balancing of two-sided disassembly lines: problem definition, MILP model and genetic algorithm approach ⋮ A path-relinking approach for a bi-criteria disassembly sequencing problem ⋮ A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system ⋮ Simplified swarm optimization in disassembly sequencing problems with learning effects
This page was built for publication: Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling