A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
DOI10.1016/J.APM.2015.02.027zbMATH Open1443.90049OpenAlexW2060033351MaRDI QIDQ2285809FDOQ2285809
Authors: Esmaeil Mehdizadeh, R. Tavakkoli-Moghaddam, Mehdi Yazdani
Publication date: 9 January 2020
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2015.02.027
Recommendations
- Hybrid discrete teaching-learning-based optimization algorithm for solving complex parallel machine scheduling problem
- A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups
- Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search
- Scheduling parallel machines to minimize weighted flowtime with family set-up times
- A three-stage optimization algorithm for the stochastic parallel machine scheduling problem with adjustable production rates
Taguchi experimental designfamily setup timesparallel machines scheduling problemvibration damping optimization
Deterministic scheduling theory in operations research (90B35) Mathematical modeling or simulation for problems pertaining to operations research and mathematical programming (90-10)
Cites Work
- Improved immune algorithm for global numerical optimization and job-shop scheduling problems
- A survey of scheduling problems with setup times or costs
- A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines
- Exact algorithms for scheduling multiple families of jobs on parallel machines
- Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach
- Parallel machine scheduling to minimize the makespan with sequence dependent deteriorating effects
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
- Scheduling unrelated parallel machines with sequence-dependent setups
- Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
- Scheduling two parallel machines with a single server: the general case
- Parallel machine scheduling with splitting jobs by a hybrid differential evolution algorithm
- Scheduling parallel machines to minimize weighted flowtime with family set-up times
- Dynamic programming algorithms for scheduling parallel machines with family setup times
- Two meta-heuristics for parallel machine scheduling with job splitting to minimize total tardiness
- Single facility multi-class job scheduling
- A simulated annealing approach to minimize the maximum lateness on uniform parallel machines
- A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property
- An exact method for \(Pm/sds, r_{i}/ \sum^{n}_{i=1} C_{i}\) problem
- The capacitated multi-facility location–allocation problem with probabilistic customer location and demand: two hybrid meta-heuristic algorithms
- Parallel machine batching and scheduling with deadlines
- The complexity of two group scheduling problems
Cited In (4)
- Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times
- Two-stage assembly scheduling problem for minimizing total tardiness with setup times
- Heuristic algorithm for lot sizing and scheduling on identical parallel machines
- Iterated greedy algorithms for a complex parallel machine scheduling problem
This page was built for publication: A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2285809)