Scheduling of maintenance windows in a mining supply chain rail network
From MaRDI portal
Publication:2289897
DOI10.1016/j.cor.2019.03.016zbMath1458.90309OpenAlexW2926914693MaRDI QIDQ2289897
Jason Matthews, Hamish Waterer, Thomas Kalinowski
Publication date: 27 January 2020
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2019.03.016
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Reliability, availability, maintenance, inspection in operations research (90B25)
Related Items (1)
Cites Work
- Rescheduling rail networks with maintenance disruptions using problem space search
- Progress in computational mixed integer programming -- a look back from the other side of the tipping point
- A survey on matheuristics for routing problems
- Combining Exact and Heuristic Approaches for the Capacitated Fixed-Charge Network Flow Problem
- Scheduling of railway track maintenance activities and crews
- Scheduling preventive railway maintenance activities
This page was built for publication: Scheduling of maintenance windows in a mining supply chain rail network