Stochastic optimization in mine planning scheduling
DOI10.1016/J.COR.2019.104823zbMATH Open1458.90356OpenAlexW2980857816WikidataQ127094233 ScholiaQ127094233MaRDI QIDQ2289909FDOQ2289909
Authors: Giovanni Franco Sepúlveda, Patricia Jaramillo Álvarez, John Branch Bedoya
Publication date: 27 January 2020
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2019.104823
Recommendations
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- A framework for adaptive open-pit mining planning under geological uncertainty
- Robust planning for an open-pit mining problem under ore-grade uncertainty
- Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
- Medium range optimization of copper extraction planning under uncertainty in future copper prices
simulationstochastic optimizationcut off grade (CoG)metaheuristic toolsmine planning schedulingpolymetallic deposit
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Stochastic programming (90C15) Production models (90B30)
Cites Work
- Introduction to Stochastic Programming
- Stability of Stochastic Nonlinear Systems With State-Dependent Switching
- Long term production planning of open pit mines by ant colony optimization
- Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty
- EID-based sliding mode investment policy design for fuzzy stochastic jump financial systems
Cited In (6)
- Robust planning for an open-pit mining problem under ore-grade uncertainty
- Medium range optimization of copper extraction planning under uncertainty in future copper prices
- Learning to schedule heuristics for the simultaneous stochastic optimization of mining complexes
- Efficient algorithms of pathwise dynamic programming for decision optimization in mining operations
- Constructing branching trees of geostatistical simulations
- Stochastic short-term mine production schedule accounting for fleet allocation, operational considerations and blending restrictions
This page was built for publication: Stochastic optimization in mine planning scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2289909)