Multi-objective reentrant hybrid flowshop scheduling with machines turning on and off control strategy using improved multi-verse optimizer algorithm
DOI10.1155/2019/2573873zbMATH Open1435.90067OpenAlexW2953977439MaRDI QIDQ2298225FDOQ2298225
Authors: Yanyan Li
Publication date: 20 February 2020
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2019/2573873
Recommendations
- Optimal foraging algorithm for multi-objective hybrid flow shop scheduling problem
- Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization
- Solving realistic industrial scheduling problems using a multi-objective improved hybrid particle swarm optimisation algorithm
- Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
- New multi-objective method to solve reentrant hybrid flow shop scheduling problem
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
- A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recircu\-lation
- Mixed binary integer programming formulations for the reentrant job shop scheduling problem
- Inventory based bi-objective flow shop scheduling model and its hybrid genetic algorithm
- Minimizing Makespan in a Class of Reentrant Shops
- Re-entrant flowshop scheduling with learning considerations to minimize the makespan
Cited In (3)
This page was built for publication: Multi-objective reentrant hybrid flowshop scheduling with machines turning on and off control strategy using improved multi-verse optimizer algorithm
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2298225)