Long-term room and pillar mine production planning based on fuzzy 0-1 linear programing and multicriteria clustering algorithm with uncertainty
DOI10.1155/2019/3078234zbMATH Open1435.90058OpenAlexW2954345779MaRDI QIDQ2298265FDOQ2298265
Authors: Miloš V. Gligorić, Zoran M. Gligorić, Čedomir R. Beljić, Suzana M. Lutovac, Vesna M. Damnjanović
Publication date: 20 February 2020
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2019/3078234
Recommendations
- Production phase and ultimate pit limit design under commodity price uncertainty
- Effective solution of the long-term open pit production planning problem using block clustering
- Optimizing long-term production plans in underground and open-pit copper mines
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- scientific article; zbMATH DE number 1481718
Production models (90B30) Boolean programming (90C09) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- The concept of a linguistic variable and its application to approximate reasoning. I
- Fuzzy sets
- Multiple attribute decision making. Methods and applications. A state-of- the-art survey
- A procedure for ordering fuzzy subsets of the unit interval
- Title not available (Why is that?)
- Optimizing long-term production plans in underground and open-pit copper mines
- Title not available (Why is that?)
- Extensions of the TOPSIS for group decision-making under fuzzy environment
- A new method for solving fully fuzzy linear programming problems
- Title not available (Why is that?)
Cited In (1)
This page was built for publication: Long-term room and pillar mine production planning based on fuzzy 0-1 linear programing and multicriteria clustering algorithm with uncertainty