A two-stage stochastic model for maintenance and rehabilitation planning of pavements
DOI10.1155/2019/3971791zbMATH Open1435.90093OpenAlexW2909939927MaRDI QIDQ2298367FDOQ2298367
Authors: Mahmoud Ameri, Armin Jarrahi, Farshad Haddadi, Mohammad Hasan Mirabimoghaddam
Publication date: 20 February 2020
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2019/3971791
Recommendations
- An executive model for network-level pavement maintenance and rehabilitation planning based on linear integer programming
- Discrete optimization models and methods for management systems of pavement maintenance and rehabilitation
- Optimization techniques for planning highway pavement improvements
- A bi-level program for solving project scheduling problems in network level pavement management systems
- Duration model estimation for pavement rehabilitation and service life
Reliability, availability, maintenance, inspection in operations research (90B25) Stochastic programming (90C15) Integer programming (90C10)
Cites Work
- A two-stage stochastic programming framework for transportation planning in disaster response
- A simulation-based approach to two-stage stochastic programming with recourse
- Title not available (Why is that?)
- Differential stability of two-stage stochastic programs
- Planning of electric power systems considering virtual power plants with dispatchable loads included: an inexact two-stage stochastic linear programming model
- A smoothing algorithm for a new two-stage stochastic model of supply chain based on sample average approximation
Cited In (3)
This page was built for publication: A two-stage stochastic model for maintenance and rehabilitation planning of pavements
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2298367)