A framework for performance measurement during production ramp-up of assembly stations
From MaRDI portal
Publication:2355810
DOI10.1016/J.EJOR.2013.02.051zbMATH Open1317.90102OpenAlexW2031765862MaRDI QIDQ2355810FDOQ2355810
Authors: Stefanos C. Doltsinis, Svetan Ratchev, Niels Lohse
Publication date: 28 July 2015
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2013.02.051
Recommendations
- Optimal production ramp‐up in the smartphone manufacturing industry
- An integrated framework for continuous assessment and improvement of manufacturing systems
- Operational flexibility quantification in a make-to-order assembly system
- Impact of ramp-up on the optimal capacity-related reconfiguration policy
- Improvability of assembly systems. I: Problem formulation and performance evaluation
Cites Work
- Investing in product development and production capabilities: the crucial linkage between time-to-market and ramp-up time
- Designing a performance measurement system: A case study.
- Good, bar or optimal? Performance assessment of multivariable processes
- Time-based competition in multistage manufacturing: stream-of-variation analysis (SOVA) methodology-review
Cited In (1)
This page was built for publication: A framework for performance measurement during production ramp-up of assembly stations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2355810)