Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing
From MaRDI portal
Publication:2378332
DOI10.1016/j.ejor.2008.01.003zbMath1175.90356OpenAlexW2070497872MaRDI QIDQ2378332
Yakup Kara, Turan Paksoy, Ching-Ter Chang
Publication date: 8 January 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.01.003
Multi-objective and goal programming (90C29) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (11)
Multi-objective parallel adjacent U-shaped assembly line balancing collaborated by robots and normal and disabled workers ⋮ Fuzzy linear programming problems: models and solutions ⋮ Balancing of parallel U-shaped assembly lines ⋮ Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach ⋮ Balancing U-type assembly lines with human-robot collaboration ⋮ Bi-criteria assembly line balancing by considering flexible operation times ⋮ An MCDA-DEA approach for mixed-model assembly line balancing problem under uncertainty ⋮ Duality in fuzzy linear programming: a survey ⋮ Multiple-criteria decision-making in two-sided assembly line balancing: a goal programming and a fuzzy goal programming model ⋮ Rules-based heuristic approach for the U-shaped assembly line balancing problem ⋮ Multi-objective multi-model assembly line balancing problem: a quantitative study in engine manufacturing industry
Cites Work
- Unnamed Item
- Unnamed Item
- A goal programming approach to simple U-line balancing problem
- Binary fuzzy goal programming
- Fuzzy programming and linear programming with several objective functions
- U-shaped assembly line layouts and their impact on labor productivity: an experimental study
- A goal approach to assembly line balancing
- Note. Optimal Balancing of U-Shaped Assembly Lines
- An Integer Programming Algorithm with Network Cuts for Solving the Assembly Line Balancing Problem
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- ULINO: Optimally balancing U-shaped JIT assembly lines
- The mixed-model U-line balancing problem
- Balancing of U-type assembly systems using simulated annealing
- The U-line Line Balancing Problem
This page was built for publication: Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing