Multiple-criteria decision-making in two-sided assembly line balancing: a goal programming and a fuzzy goal programming model

From MaRDI portal
Publication:1000989

DOI10.1016/j.cor.2008.06.009zbMath1179.90191OpenAlexW2055496242MaRDI QIDQ1000989

Bilal Toklu, Uğur Özcan

Publication date: 12 February 2009

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2008.06.009




Related Items

Balancing two-sided assembly lines with sequence-dependent setup timesBalancing parallel two-sided assembly linesMulti-neighborhood based path relinking for two-sided assembly line balancing problemA meta-heuristic algorithm for the fuzzy assembly line balancing type-E problemAn effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly linesModel and heuristics for the assembly line worker integration and balancing problemTwo-sided assembly line balancing problem of type I: improvements, a simple algorithm and a comprehensive studyAlgorithms and implementation of a set partitioning approach for modular machining line designAn efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstationsVariable neighborhood search for the second type of two-sided assembly line balancing problemBalancing stochastic parallel assembly linesSolving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approachMulti-criteria decision analysis with goal programming in engineering, management and social sciences: a state-of-the art reviewSupply chain management through the stochastic goal programming modelNew mathematical and constraint programming models for U-type assembly line balancing problems with assignment restrictionsRobust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup timesOptimization on production-inventory problem with multistage and varying demandBi-criteria assembly line balancing by considering flexible operation timesBalancing two-sided U-type assembly lines using modified particle swarm optimization algorithmModelling transfer line design problem via a set partitioning problemBees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problemOn the complexity of assembly line balancing problemsReduction approaches for a generalized line balancing problemDuality in fuzzy linear programming: a surveyA branch-and-bound algorithm to minimize the line length of a two-sided assembly lineBalancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithmA new approach of Romero's extended lexicographic goal programming: fuzzy extended lexicographic goal programmingTwo-sided assembly line balancing problem with parallel performance capacityCentralized construction contractor selection considering past performance of contractors: a case of India


Uses Software


Cites Work