New mathematical and constraint programming models for U-type assembly line balancing problems with assignment restrictions
From MaRDI portal
Publication:6094522
DOI10.1080/0305215x.2021.1921171zbMath1523.90191OpenAlexW3160365049MaRDI QIDQ6094522
Publication date: 10 October 2023
Published in: Engineering Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0305215x.2021.1921171
mathematical programmingconstraint programmingassembly line balancingassignment restrictionsU-type problem
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Combinatorial optimization (90C27)
Related Items (1)
Cites Work
- A goal programming approach to simple U-line balancing problem
- Ant algorithms for a time and space constrained assembly line balancing problem
- A chance-constrained approach to stochastic line balancing problem
- Multiple-criteria decision-making in two-sided assembly line balancing: a goal programming and a fuzzy goal programming model
- Traveling worker assembly line (re)balancing problem: model, reduction techniques, and real case studies
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- Two-sided assembly lines balancing with assignment restrictions
- Rules-based heuristic approach for the U-shaped assembly line balancing problem
- A classification of assembly line balancing problems
- A versatile algorithm for assembly line balancing
- Branch and bound procedures for solving the assembly line worker assignment and balancing problem: Application to sheltered work centres for disabled
- A shortest route formulation of simple U-type assembly line balancing problem
- Balancing assembly lines with tabu search
- Constraint programming model for multi-manned assembly line balancing problem
- Evaluation of mixed-model U-line operational designs
- A Branch-and-Cut Approach for a Generic Multiple-Product, Assembly-System Design Problem
- A cutting plane approach for the single-product assembly system design problem
- Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion
- Balancing assembly lines: an industrial case study
- A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
- Hybrid assembly line design and user's preferences
- Balancing stochastic type-II assembly lines: chance-constrained mixed integer and constraint programming models
- ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations
This page was built for publication: New mathematical and constraint programming models for U-type assembly line balancing problems with assignment restrictions