Balancing two-sided assembly lines with sequence-dependent setup times

From MaRDI portal
Publication:3163182


DOI10.1080/00207540903140750zbMath1197.90224OpenAlexW2151301433MaRDI QIDQ3163182

Uğur Özcan, Bilal Toklu

Publication date: 25 October 2010

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540903140750



Related Items

Assembly line balancing: what happened in the last fifteen years?, An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines, Two-sided assembly line balancing problem of type I: improvements, a simple algorithm and a comprehensive study, Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem, An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations, Variable neighborhood search for the second type of two-sided assembly line balancing problem, Sequence-dependent time- and cost-oriented assembly line balancing problems: a combinatorial Benders’ decomposition approach, Constraint programming approach for multi-objective two-sided assembly line balancing problem with multi-operator stations, Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times, Mathematical model and a variable neighborhood search algorithm for mixed-model robotic two-sided assembly line balancing problems with sequence-dependent setup times, Balancing and scheduling of flexible mixed model assembly lines, Combinatorial Benders cuts for assembly line balancing problems with setups, Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm, Solving the stochastic dynamic lot-sizing problem through nature-inspired heuristics, Two-sided assembly line balancing problem with parallel performance capacity, Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times



Cites Work