A multiperiod model for production planning and design in a multiproduct batch environment
From MaRDI portal
Publication:2390166
Recommendations
- A multiproduct batch plant design model incorporating production planning and scheduling decisions under a multiperiod scenario
- A PRODUCTION PLANNING MODEL FOR MULTI-PRODUCT FACILITIES
- Hierarchical production planning and scheduling in a multi-product, batch process environment
- A matheuristic approach for the design of multiproduct batch plants with parallel production lines
- Planning and scheduling of multistage multiproduct batch plants operating under production campaigns
- On the noniterative multiproduct multiperiod production planning method
- scientific article; zbMATH DE number 4022999
- scientific article; zbMATH DE number 910793
- Models for Design and Control of Stochastic, Multi-Item Batch Production Systems
Cited in
(13)- A multi-phase model for product part change problems
- A matheuristic approach for the design of multiproduct batch plants with parallel production lines
- Production planning with multiple production lines: Forward algorithm and insights on process design for volume flexibility
- Retrofit of multiproduct batch plants through generalized disjunctive programming
- Unit-operation nonlinear modeling for planning and scheduling applications
- Hierarchy of processing equipment configuration design problems for multiproduct chemical plants
- A multiproduct batch plant design model incorporating production planning and scheduling decisions under a multiperiod scenario
- An AHP-based decision-making tool for the solution of multiproduct batch plant design problem under imprecise demand
- Optimal design of heat-integrated multipurpose batch facilities with economic savings in utilities: A mixed integer mathematical formulation
- An MILP model for planning of batch plants operating in a campaign-mode
- MOPP-I: an optimization package for multipurpose batch operations
- Optimal maintenance planning and crew allocation for multipurpose batch plants
- Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods
This page was built for publication: A multiperiod model for production planning and design in a multiproduct batch environment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2390166)