scientific article; zbMATH DE number 910793
From MaRDI portal
Publication:4885956
Recommendations
- Heuristic scheduling of jobs on a multi-product batch processing machine
- scientific article; zbMATH DE number 3947982
- The G-group heuristic for single machine lot scheduling
- Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
Cited in
(6)- A multiperiod model for production planning and design in a multiproduct batch environment
- Determination of economic production quantities for a two-product single machine system
- scientific article; zbMATH DE number 3947982 (Why is no real title available?)
- An heuristic algorithm for a multi-product, single machine capacitated production scheduling problem
- A heuristic approach for big bucket multi-level production planning problems
- A comparison of two lot sizing-sequencing heuristics for the process industry
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4885956)