Optimizing replacement policy for a cold-standby system with waiting repair times
From MaRDI portal
Publication:2391295
Recommendations
- An optimal repair-replacement policy for a cold standby system with use priority
- Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
- Maintenance and replacement model for cold standby repairable system
- An optimal replacement policy for repairable cold standby system with priority in use
- A geometric process repair model for a cold standby repairable system with imperfect delay repair and priority in use
Cites work
- A deteriorating cold standby repairable system with priority in use
- A note on the optimal replacement problem
- A novel repair model for imperfect maintenance
- A quasi renewal process and its applications in imperfect maintenance
- Reliability analysis for a \(k/n(F)\) system with repairable repair-equipment
- Replacement problems for a cold standby repairable system
Cited in
(15)- A novel optimal preventive maintenance policy for a cold standby system based on semi-Markov theory
- On reliability analysis of a two-dependent-unit series system with a standby unit
- Copula-based reliability analysis for a parallel system with a cold standby
- Reliability analysis of a cold standby repairable system with repairman extra work
- scientific article; zbMATH DE number 2075902 (Why is no real title available?)
- A bivariate optimal replacement policy for a cold standby repairable system with preventive repair
- Reliability analysis of two-unit cold standby repairable systems under Poisson shocks
- Optimal completed work dependent loading of components in cold standby systems
- Shock and wear degradating systems under three types of repair
- Reliability analysis for the consecutive-\(k\)-out-of-\( n\):\( F\) system with repairmen taking multiple vacations
- The ordering and replacement policy for the system with two types of failures
- A new approach for analyzing the reliability of the repair facility in a series system with vacations
- Optimal loading of system with random repair time
- Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
- Reliability analysis of a cold standby system attacked by shocks
This page was built for publication: Optimizing replacement policy for a cold-standby system with waiting repair times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2391295)