Single-machine scheduling problems with an aging effect
From MaRDI portal
Publication:2471338
DOI10.1007/BF02832355zbMath1178.90167OpenAlexW2047148467MaRDI QIDQ2471338
Publication date: 22 February 2008
Published in: Journal of Applied Mathematics and Computing (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf02832355
Related Items (3)
Multitasking scheduling problems with deterioration effect ⋮ Single machine scheduling with general job-dependent aging effect and maintenance activities to minimize makespan ⋮ Single‐machine common flow allowance scheduling with aging effect, resource allocation, and a rate‐modifying activity
Cites Work
- Time-optimal control in a single machine problem with resource constraints
- Single-machine scheduling with learning considerations
- No-wait or no-idle permutation flowshop scheduling with dominating machines
- Scheduling with general job-dependent learning curves.
- A bi-criterion single-machine scheduling problem with learning considerations
- Flow shop scheduling jobs with position-dependent processing times
- Resource optimal control in some single-machine scheduling problems
- Parallel machine scheduling with a learning effect
- Scheduling jobs with position-dependent processing times
- Note on scheduling with general learning curves to minimize the number of tardy jobs
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Scheduling problems with a learning effect
This page was built for publication: Single-machine scheduling problems with an aging effect