Upper bounds on the slump length in plug cementing of near-horizontal wells
From MaRDI portal
Publication:2486530
Recommendations
- Transient fluid motions in a simplified model for oilfield plug cementing.
- Preventing buoyancy-driven flows of two Bingham fluids in a closed pipe. -- Fluid rheology design for oilfield plug cementing
- A model for foamed cementing of oil and gas wells
- Primary cementing of horizontal wells. Displacement flows in eccentric horizontal annuli. Part 1. Experiments
- Gravity-driven flow in a horizontal annulus
Cited in
(2)
This page was built for publication: Upper bounds on the slump length in plug cementing of near-horizontal wells
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2486530)