Hybrid algorithm for scheduling with regard for reinvestment of profits
From MaRDI portal
Publication:2487741
DOI10.1023/B:AURC.0000019377.90714.90zbMATH Open1115.90340OpenAlexW1992666999MaRDI QIDQ2487741FDOQ2487741
Authors: S. L. Sukhikh, V. V. Servakh
Publication date: 8 August 2005
Published in: Automation and Remote Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/b:aurc.0000019377.90714.90
Recommendations
- A Hybrid Algorithm for a Class of Resource Constrained Scheduling Problems
- A hybrid approach to scheduling with earliness and tardiness costs
- Hybrid algorithm for project scheduling with capacity constraint
- A hybrid method for the planning and scheduling
- Reconsidering mixed integer programming and MIP-based hybrids for scheduling
- Hybrid heuristic algorithm for integrated scheduling in flexible job shops
- Principles and Practice of Constraint Programming – CP 2004
- A family of scheduling algorithms for hybrid parallel platforms
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35)
Cited In (6)
- On scheduling credited projects
- A Boolean programming problem of choosing an optimal portfolio of projects and optimal schedules for them by reinvesting within the portfolio the profit from project implementation
- Financing and reliability analysis for schedules in the project calendar planning problem
- A graphical approach to solve an investment optimization problem
- Complexity of the project scheduling problem with credits
- Title not available (Why is that?)
Uses Software
This page was built for publication: Hybrid algorithm for scheduling with regard for reinvestment of profits
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2487741)