Manufacturing lead time estimation using data mining
From MaRDI portal
Publication:2496089
DOI10.1016/J.EJOR.2005.03.015zbMATH Open1110.90032OpenAlexW2042567292MaRDI QIDQ2496089FDOQ2496089
Authors: Atakan Öztürk, Sinan Kayaligil, Nur Evin Ozdemirel
Publication date: 30 June 2006
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2005.03.015
Recommendations
- Lead time prediction in unbalanced production systems
- Data mining: manufacturing and service applications
- Manufacturing lead times, system utilization rates and lead-time-related demand
- Data-mining-based dynamic dispatching rule selection mechanism for shop floor control systems using a support vector machine approach
- Application of decision tree as a data mining tool in a manufacturing system
Cites Work
- Title not available (Why is that?)
- Bagging predictors
- Survey of scheduling research involving due date determination decisions
- Due Date Assignment for Production Systems
- A Simulation Study of Predictable Due-Dates
- A dynamic forecasting model for job shop flowtime prediction and tardiness control
- Lead time prediction in unbalanced production systems
- Strike Rate Matrices for Integrating Marketing and Production During the Tendering Process in Make-to-Order Subcontractors
Cited In (5)
- Production planning with load dependent lead times: An update of research
- Multicriteria variable selection for classification of production batches
- Synergies of operations research and data mining
- Synergies between operations research and data mining: the emerging use of multi-objective approaches
- A decision making process application for the slurry production in ceramics via fuzzy cluster and data mining
Uses Software
This page was built for publication: Manufacturing lead time estimation using data mining
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2496089)