A mixed integer programming model for scheduling orders in a steel mill
From MaRDI portal
Publication:2563111
DOI10.1007/BF00932613zbMath0268.90046MaRDI QIDQ2563111
Publication date: 1974
Published in: Journal of Optimization Theory and Applications (Search for Journal in Brave)
Applications of mathematical programming (90C90) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35)
Related Items
A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex ⋮ A mathematical programming model for scheduling steelmaking-continuous casting production ⋮ A GRASP heuristic for slab scheduling at continuous casters ⋮ A time indexed formulation of non-preemptive single machine scheduling problems ⋮ A review of planning and scheduling systems and methods for integrated steel production ⋮ On scheduling a single machine to minimize a piecewise linear objective function: A compact MIP formulation ⋮ Auction-based approach to resolve the scheduling problem in the steel making process ⋮ A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
Cites Work