Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times
From MaRDI portal
Publication:2564613
DOI10.1007/BF00121663zbMath0868.90058MaRDI QIDQ2564613
Mohsen Elhafsi, Sherman X. Bai
Publication date: 15 January 1997
Published in: Journal of Global Optimization (Search for Journal in Brave)
feedback controlone-machine two-product manufacturing systemcontinuous time dynamic environmentsetup changes
Related Items (5)
Two-product inventory management with fixed costs and supply uncertainty ⋮ Production and set-up control of a failure-prone manufacturing system ⋮ Transient and steady-state analysis of a manufacturing system with setup changes ⋮ The impact of controllable production rates on the performance of inventory systems: a systematic review of the literature ⋮ Scheduling one-part-type serial manufacturing system under periodic demand: A solvable case
Cites Work
- Unnamed Item
- Unnamed Item
- Dynamic setup scheduling and flow control in manufacturing systems
- The common cycle economic lot scheduling problem with backorders: Benefits of controllable production rates
- Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
- Transient and steady-state analysis of a manufacturing system with setup changes
- Dynamic instabilities and stabilization methods in distributed real-time scheduling of manufacturing systems
- One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate
- Determination of economic production quantities for a two-product single machine system
- Controllable production rates in a family production context
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- 98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Stable, distributed, real-time scheduling of flexible manufacturing/assembly/diassembly systems
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
This page was built for publication: Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times