Complexity of two dual criteria scheduling problems
From MaRDI portal
Publication:2643797
DOI10.1016/J.ORL.2006.01.007zbMATH Open1149.90342OpenAlexW2033326904MaRDI QIDQ2643797FDOQ2643797
Authors: Yumei Huo, Joseph Y.-T. Leung, Hairong Zhao
Publication date: 27 August 2007
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2006.01.007
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Multicriteria scheduling problems: a survey
- Complexity of single machine, multi-criteria scheduling problems
- Minimizing Total Tardiness on One Machine is NP-Hard
- Title not available (Why is that?)
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Multicriteria scheduling
- Title not available (Why is that?)
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- Title not available (Why is that?)
- A note on a scheduling problem with dual criteria
- A note on the extension of a result on scheduling with secondary criteria
- One machine sequencing to minimize mean flow time with minimum number tardy
Cited In (13)
- Single-machine primary-secondary scheduling with total tardiness being the primary criterion
- Scheduling to tradeoff between the number and the length of accepted jobs
- Two-agent scheduling of unit processing time jobs to minimize total weighted completion time and total weighted number of tardy jobs
- Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
- A survey of single machine scheduling to minimize weighted number of tardy jobs
- New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs
- Title not available (Why is that?)
- Title not available (Why is that?)
- BICRITERIA SCHEDULING ON SINGLE-MACHINE WITH INVENTORY OPERATIONS
- Counting and enumeration complexity with application to multicriteria scheduling
- Single-machine multi-agent scheduling problems with a global objective function
- Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardiness
This page was built for publication: Complexity of two dual criteria scheduling problems