Equitable routing of rail hazardous materials shipments using CVaR methodology
From MaRDI portal
Publication:2668637
Recommendations
- Finding equitable risk routes for hazmat shipments
- Modeling Equity of Risk in the Transportation of Hazardous Materials
- Generalized route planning model for hazardous material transportation with VaR and equity considerations
- Finding minimum and equitable risk routes for hazmat shipments
- A Multiple Route Conditional Risk Model For Transporting Hazardous Materials
Cites work
- scientific article; zbMATH DE number 1349588 (Why is no real title available?)
- A comprehensive modeling framework for hazmat network design, hazmat response team location, and equity of risk
- A model to assess risk, equity and efficiency in facility location and transportation of hazardous materials
- A routing and scheduling approach to rail transportation of hazardous materials with demand due dates
- Catastrophe avoidance models for hazardous materials route planning
- Dynamic conditional value-at-risk model for routing and scheduling of hazardous material transportation networks
- Finding minimum and equitable risk routes for hazmat shipments
- Finding the K Shortest Loopless Paths in a Network
- Generalized route planning model for hazardous material transportation with VaR and equity considerations
- Modeling Equity of Risk in the Transportation of Hazardous Materials
- On finding dissimilar Pareto-optimal paths
- On the selection of \(k\) routes in multiobjective hazmat route planning
- Railroad transportation of dangerous goods: population exposure to airborne toxins
- The maximin HAZMAT routing problem
- Utility Functions for Equity and Public Risk
- Validation of subgradient optimization
- Value-at-Risk model for hazardous material transportation
Cited in
(4)- Finding equitable risk routes for hazmat shipments
- Hazardous material transportation problems: a comprehensive overview of models and solution approaches
- Generalized route planning model for hazardous material transportation with VaR and equity considerations
- A routing and scheduling approach to rail transportation of hazardous materials with demand due dates
This page was built for publication: Equitable routing of rail hazardous materials shipments using CVaR methodology
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2668637)