Minimizing the machine processing time in a flow shop scheduling problem under piecewise quadratic fuzzy numbers
DOI10.1155/2022/3990534zbMATH Open1497.90105OpenAlexW4293787041MaRDI QIDQ2676012FDOQ2676012
Authors: Tingwei Zhou, Hamiden Abd El-Wahed Khalifa, Seyyed Esmaeil Najafi, S. A. Edalatpanah
Publication date: 27 September 2022
Published in: Discrete Dynamics in Nature and Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2022/3990534
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Cites Work
- Fuzzy sets and systems. Theory and applications
- Fuzzy programming and linear programming with several objective functions
- Decision-Making in a Fuzzy Environment
- Fuzzy sets
- Optimal two- and three-stage production schedules with set-up time included
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Title not available (Why is that?)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
- A new approach to two-machine flow shop problem with uncertain processing times
- Optimal schedules for special structure flowshops
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation
- A novel method for a fractional derivative with non-local and non-singular kernel
- Flow shop scheduling problem with position-dependent processing times
Cited In (1)
This page was built for publication: Minimizing the machine processing time in a flow shop scheduling problem under piecewise quadratic fuzzy numbers
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2676012)