A heuristic approach to minimizing the waiting time of jobs in two stage flow shop scheduling
From MaRDI portal
(Redirected from Publication:6566823)
Cites work
- An integrated bi-objective U-shaped assembly line balancing and parts feeding problem: optimization model and exact solution method
- Minimizing the machine processing time in a flow shop scheduling problem under piecewise quadratic fuzzy numbers
- On a flow-shop scheduling problem with fuzzy pentagonal processing time
- Optimal schedules for special structure flowshops
- Solving constrained flow-shop scheduling problem through multistage fuzzy binding approach with fuzzy due dates
- Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches
This page was built for publication: A heuristic approach to minimizing the waiting time of jobs in two stage flow shop scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6566823)